Monday, December 28, 2009

Iron Ore

COMMODITY: IRON ORE TENOR 65%. Rejection – 62.5%
ORIGIN: BRAZIL
INCOTERM: CIF ASWP
PRICE/QUANTITY:
US$ 103.00 MT X 60 months (READJUST HALF-YEARLY)
6.000.000.00 MT > Contract 05 YEARS.
100.000.00 MT ILHEÚS PORT (2 SHIPS 50.000 MT) or
100.000.00 MT BARCARENA PORT (2 SHIPS 50.000 MT)
DESTINATION: Any Safe World Port.
PORTS OF LOADING:
1) ILHEÚS PORT – BAHIA , BRAZIL
2) BARCARENA PORT – PARÁ – BRASIL
CONTRACT DURATION:
60 months
SHIPMENT SCHEDULE:
45-90 WORKING DAYS After CONFIRMATION ARDLC
MINE VISITING: ALLOWED after signature of contract
PACKAGING: BULK.
VALIDITY: Till DECEMBER 30 , 2009.

No comments:

Post a Comment